Maintaining Air Monitoring Plant - H2S
This course will provide training on how to carry out routine inspections and maintenance of the air monitoring plant. It will also introduce possible reactive maintenance scenarios and the recommended responses.
Description
Key Topic Areas
Training will cover all manufacturers recommended inspection, routine and reactive maintenance requirements, safe isolation and manual operation where available. This will include:
- Potential hazards and risk mitigation specific to this task, addressed throughout the training below, as it progresses;
- Routine inspection:
- Pump/compressor oil level;
- Clean fans;
- Sample lines condensation check;
- Sample line cleaning of inlet point at ATU;
- Trace heating operational check
- Routine maintenance:
- Oil top up;
- Reactive maintenance:
- Local level error codes/alarms and meaning;
- Fault finding and corrective actions;
- Clearing alarms at the local level.
Outcomes
On completion of the training, Delegates are expected to be able to:
- Carry out a routine inspection of the plant and identify obvious issues;
- Carry out routine maintenance of the plant;
- Understand the possible reactive maintenance scenarios, how to make safe following a failure and the steps towards resolution.
Competency/Skills Requirements
Before attending the training session, Delegates are expected to complete:
- Safety Fundamentals - Module 1 (Plans and Reporting);
- Safety Fundamentals - Module 2 (Introduction to Hazards);
- Safety Fundamentals - Module 3 (Chamber Access);
- HMI Operator Training Worksite Level;
- Maintenance Fundamentals.
Before attending the training, Delegates are also expected to have:
- Experience working with similar plant;
- Experience working with similar instrumentation;
- Been trained in confined space entry;
- CompEx (Competency in Explosive atmospheres) certification.